Tagged: Costs
The ‘Super Bomb’: More financials
After my recent post about the cost of using cruise missiles in Syria, the Americans have now used a ‘MOAB’. This is a ‘Super Bomb’, nicknamed ‘The Mother of All Bombs’, a corruption of the bomb’s acronym, which stands for ‘Massive Ordnance Air Blast’. The actual designation of the device is GBU/43B, which doesn’t float well as a headline in quite the same way, does it?
This enormous explosive device is the biggest non-nuclear weapon ever detonated, according to some reports. However, during WW2, slightly larger bombs weighing 22,000 lbs were used and known as ‘Grand Slams’. The MOAB was developed at a cost of an estimated $300,000,000. This also included the cost of the 20 bombs delivered. Each one is estimated to have cost $16,000,000, and the logistical costs involved in the deployment and delivery this week are believed to be close to $1,000,000.
On this occasion, I will refrain from speculating what better use could have been made of that money. However, it is worth looking at the result. The bomb detonated just above a tunnel complex, believed to be used by insurgent fighters in the region. The blast could be felt almost two miles away, but reports say that no civilians were injured. The claim is that 36 fighters were killed by the bomb, confirmed by Afghan soldiers, and US Special Forces personnel on the ground.
The sum is simple enough. $17,000,000 divided by 36 = $472,222. That’s what it cost to kill each man in that tunnel complex. Current estimates agree that ISIS has around 20,000 fighters in Syria alone. Other sources estimate that the Taliban has a force in excess of 35,000 operating in Afghanistan and Pakistan. So, if we use the same cost basis to destroy every one of those 55,000 remaining soldiers, we are left with a pretty big bill, one that America has to fund. $25,972,221. (Yes, almost 26 BILLION dollars)
Compared to the cost of the cruise missile attack that only killed six people, that’s very good value, I suppose. A bargain.